Difference between revisions of "Targets/Meetings/2014-09-09"

From PASI
Jump to: navigation, search
Line 8: Line 8:
  
 
(4) [[Media:04-Loveridge-09Sep14.pdf|Thermal tests for the Mu2e target]] - Peter Loveridge
 
(4) [[Media:04-Loveridge-09Sep14.pdf|Thermal tests for the Mu2e target]] - Peter Loveridge
 +
 +
(5) [[Media:05-McFarland-09Sep14.pdf|Upgrade to the little wire test]] - Adrian McFarland
  
 
(8) [[Media:08-Bungau-09Sep14.pdf|Studies of TS1 upgrade to >1MW]] - Cristian Bungau
 
(8) [[Media:08-Bungau-09Sep14.pdf|Studies of TS1 upgrade to >1MW]] - Cristian Bungau

Revision as of 15:50, 11 September 2014

Agenda

(1) Welcome and accelerator review - Rob Edgecock

(2) HIPSTER - Chris Densham

(3) Target erosion tests - Otto Caretta

(4) Thermal tests for the Mu2e target - Peter Loveridge

(5) Upgrade to the little wire test - Adrian McFarland

(8) Studies of TS1 upgrade to >1MW - Cristian Bungau